Refurbishment & restoration for the revival of the solar plant with Operation and Maintenance for the remaining period up to 10 years of operation from the date of commissioning of the 48 sites of distributed solar plant of cumulative capacity 51.89 MWp in Maharashtra.

Documents/Links

Document
Amendment -1